Team Tempest Reveals a Different Approach to FCAS
The team tasked with engineering the UK’s FCAS are concentrating on technology and capability development ahead of finalizing platform design.
While tunnel tests have been conducted with notional Tempest configurations, the platform's design will not be finalized for some time. (Photo: BAE Systems)
While tunnel tests have been conducted with notional Tempest configurations, the platform's design will not be finalized for some time. (Photo: BAE Systems)